Quality Control Manager
Responsibilities
The Quality Control Manager (QCM) is responsible of ensuring the quality of the work performed by the subcontractor and then reporting it to the Project Manager. He is also responsible of assigning inspectors with appropriate knowledge of civil, mechanical and electrical systems to perform inspections, tests and preparations.
Documentation Requirements
Control of Documents
Documents required by the subcontractor are controlled accordingly:
- Approve of documents for adequacy prior to the issue
- Review and updating as necessary and re-approving the documents
- Ensuring that changes and current revisions of the document status are identified
- Ensuring that relevant versions of applicable documents are available at points of use
- Ensuring that documents remain legible and readily identifiable
- Ensuring that documents of external origin are identified and their distribution's controlled
- Preventing the unintended use of obsolete documents and applying suitable identifications if retained for any purpose
Control of Records
Records are established and maintained to provide evidence of conformity and to have effective operation for the Quality Plan. Records then remain legible, readily identifiable and retrievable. Measures shall be established to define the controls needed for the identification, storage, protection, retention time and disposition of records.
Purchasing
Purchasing Process
The organization ensures that purchased products conform to specify the purchased requirements. The type and extent of control applied to the supplier and the purchased product are dependent upon the effect of the purchased product on subsequent result or the final out come.
Purchasing Information
Purchasing information describes the product where appropriate.
- Requirements for approval of the product, procedures, processes and equipment
- Requirements for qualification of personnel
Verification of Purchased Product
The organization carries out inspections or other activities necessary to ensure that purchased products meet specified purchase requirements.
Inspection and testing
A three-phase control system will be implemented for inspection and testing activities. The three-phase system includes preparation, initial and follow-up phases.
Preparatory Phase
This phase is performed prior to beginning of the work for different elements including formwork, concrete placement, equipment installation, testing, etc.
The phase follows accordingly:
- A review of each paragraph of applicable specifications, reference codes and standards
- A review of applicable drawings
- A check to assure that all materials and/or equipment have been tested, submitted and approved
- Examination of the work area ensuring all required preliminary work has been completed
- Physical examinations of required materials, equipment and sample work to assure that they are on hand, conformed to approve shop drawings or submitted data and properly stored
- A review of the appropriate job hazard analysis activity to assure safety requirements are met
- Discussions of procedures for controlling quality of the work, including deficiencies
|